Meta Description (SEO): Compact solar milk tea kiosk in a 10ft container: 6 kWp solar, 20 kWh storage, 200–350 cups per day, fits a standard parking space, ideal for street corners and food halls.
The Mini Compact 10FT packs a profitable milk tea operation into a 10-foot container that fits a standard parking space. With 6 kWp of rooftop solar and 20 kWh of battery storage, it covers a full trading day on sun power alone in most climates. It is the fastest, most affordable way to open a branded solar store — from city corners to food courts and weekend markets.
| Parameter | Specification | Note |
|---|---|---|
| Container size | 10 ft (approx. 3.05 * 2.44 * 2.90 m) | Standard shipping container, corten steel, IP54 |
| Shop area | About 6 m² | Counter + compact prep area |
| Solar capacity | 6 kWp (roof mounted) | Monocrystalline PERC 550W, 25-yr warranty |
| Battery storage | 20 kWh LiFePO4 | 6,000 cycles @80% DoD, 10-yr warranty |
| Inverter | 5 kW hybrid, MPPT | Grid-tie or off-grid modes |
| Est. daily generation | 24–30 kWh | Based on 4–5 peak sun hours, 80% system efficiency |
| Off-grid autonomy | 1–2 days | At typical load of 12–18 kWh/day |
| Output capacity | 200–350 cups/day | Depending on menu and staffing |
| Power modes | Off-grid or grid-tie hybrid | Auto switch by EMS |
| Set-up time | About 2 days on site | No foundation required |
| Operating temperature | -20°C to +50°C | Insulated shell |
| Included equipment | Sealing machine, ice maker, 1–2 fridges, POS, HVAC, water tanks | Factory pre-installed |
Lowest entry cost in the lineup means faster payback and easier financing. Because the unit is relocatable, you are not locked into a lease — move to better foot traffic whenever the numbers say so. Solar keeps running costs near zero, which directly improves store-level margins.
Q: How much space do I need?
A: About 10 m² of flat ground — the container itself fits one standard parking space, plus room for service and queuing.
Q: Can it be moved later?
A: Yes. It is transported by flatbed truck like a standard container and can be re-leveled and re-commissioned at a new site in about 2 days.
Q: Is grid connection required?
A: No. It runs off-grid on solar and battery; grid connection is optional where available.
Send your inquiry directly to us